A15 Overpass near Rudamina

Project title

A15 Overpass near Rudamina

Completed projects
Projektavimas ir rangos darbai
Construction type
Rekonstravimas
Project Location
A15 railway crossing near Rudamina
Builder
LTG INFRA
fegda group companies
Fegda, Tilsta, SRP projektas
Completed
2022
Parameters
Category II road | Reconstruction length – 664 m (including the overpass) | Viaduct length: 55.4 m

Following the implementation of the project, a grade-separated intersection replaced the former level crossing, allowing traffic on the A15 road to pass over the railway without interruption. A new overpass was constructed during the reconstruction, ensuring safer and smoother traffic flow, reducing delays, and increasing both road and rail safety. This solution improved connectivity and contributed to the development of more efficient transport infrastructure in the region.